Get a Quote
--:--

Fuel infrastructure contractors since 1972

Fuel infrastructure. Built to last.

  • Paz
  • Sonol
  • Dor Alon
  • Mega Or
Who We Are

Since 1972 we have been building what lies beneath the forecourt: tanks, piping and concrete that must work for decades without a single mistake. Today the same precision serves emergency generators in data centers.

  • 67 HaMeyasdim St., Moshav BnayaOffice and logistics warehouse
  • Service areaAll of Israel
  • Our own heavy equipmentPermanent crews
1972

Year founded. A family company for fuel infrastructure, second generation at the helm.

54

Years of experience building and upgrading fuel infrastructure.

6

Fields of expertise, from fuel station planning to data center infrastructure.

5

Leading Israeli companies among our clients.

FAQ

Before you pick up the phone

Can a station be renovated without closing it?

Yes. Most of our renovations take place at operating stations. We plan the work in phases, fence off each work zone, and keep some of the dispensers open throughout the project.

How long does it take to build a new fuel station?

It depends on the scope, the permits and the ground conditions. In the first call we get to know the project and give a clear schedule estimate, and the quote breaks it down by stage.

Which standards does the work meet?

The standards of the Ministry of Environmental Protection and the Ministry of Labor: Stage II vapor recovery, double-wall tanks and piping, 5-gallon spill containment, cathodic protection and static grounding, oil separators, and documented pressure and tightness testing.

Planning to build or upgrade a fuel station?